ProCoat started from a straightforward observation. The acoustical ceilings being torn out of buildings were dirty rather than failed, and the tile in them still had decades of service left.
The obstacle was that the obvious alternative, painting them, destroyed the acoustic performance and the flame spread rating and sealed the tiles into the grid. So the choice on the table was an expensive answer or a damaging one.
The company has spent four decades making the case that restoration is a third option between those two, and building the crews and the specification that make it deliverable at scale. The programs on the case study pages are the result of that, not the cause of it.