Industry

Retail and grocery

Store hours, program pace, and the questions construction teams ask first.

Who we talk to

Director of Construction

The constraint

The store cannot close

Typical pace

One to two locations a week

The situation

The ceiling is the last line on the remodel schedule and the first one to cause trouble

A multi-site remodel runs on store hours. Every night a store is dark costs money, and a ceiling tear-out takes days rather than hours. So the ceiling gets skipped, and a store with new flooring, new fixtures and new lighting opens under a twenty year old ceiling that is gray, stained and patched with mismatched replacement tiles.

Customers do not look up. They do notice that the store feels dated, they notice that it is loud, and in a grocery store the ceiling sits directly over food.

Restoration fits the schedule the program already runs on. A crew comes in after close, the space is masked, the ceiling is sprayed in place, and the store opens the next morning on time.

Overnight, per store

Most retail footprints are a single shift. Larger formats run consecutive nights without ever closing to the public.

Stock stays where it is

Fixtures, shelving and stock are masked rather than moved, so there is no clear and reset labor falling on your team.

Nothing to air out

Water-based and low odor. There is nothing to clear before the doors open and nothing to explain to staff arriving for the morning shift.

From a completed program

What a national retail program has looked like

41Locations restored on one rolling schedule29 states, including Alaska
4.3MSquare feet of tile, grid and air diffusers coatedSame program
27Crews running one to two stores a weekSeven months end to end
50%Saved against removing tile, painting grid and installing newApproximate, same program

Specialty retail, sales floor

Same store, same tiles, one night

Retail store acoustical ceiling before restoration, tile yellowed and stained above the sales floor
BeforeOctober 23, original tile
The same store ceiling the following morning, tile and grid uniform and white with the stock untouched
AfterOctober 24, open the next morning

The same tile, restored in place. The grid and the air diffusers are coated at the same time, which is the difference between a restored ceiling and a repainted one.

Objections

What construction and store planning teams ask first

Is this just painting the ceiling?

No. Paint bridges the tile to the grid and seals the perforations, so the tile will not lift afterward and the sales floor gets louder. The coating is formulated not to bridge that joint, which is why the ceiling still works as a ceiling when the store opens.

How long before we can open?

Most retail footprints are a single overnight shift. Masking comes down before staff arrive, and there is no solvent odor to clear off a sales floor.

What about the deli and the bakery?

Food preparation ceilings take ProVinyl rather than the tile coating: high gloss, washable, with an antimicrobial additive, under Section 09 91 23. Those rooms are usually what an inspection turns on.

What if our tiles are stained, not just dirty?

Water staining is treated before coating, and the source has to be fixed first. Tiles that have failed are replaced. You get that count at the survey, not once the crew is on site.

Can you match our white across every store?

Standard white or a custom tint to your specification, held consistent across the portfolio and recorded, so a program running over many months still reads as one brand at the end of it.

What happens to the Class A flame spread rating?

ProCoustic keeps the ceiling’s Class A rating. In independent ASTM E84 testing, flame spread dropped from 25 to 0 and smoke developed from 10 to 5. The test documentation goes into your file.

Proof

Retail and grocery, in the field

National multi-site program

Forty-one locations in seven months

Twenty-nine states, twenty-seven crews and more than four million square feet, run at one to two stores a week without closing a single one of them to the public.

Read the case study

Weis Markets

Forty thousand square feet, two weeks, no closure

A last inspection before a grand opening found the ceiling untouched by the remodel. Restored in place around the fixtures and the stock, finished before the doors opened.

Read the case study

Staples

Twenty-two thousand square feet in three nights

A build-out with a one-week ceiling window. Finished in three nights, with four days of labor cost handed back to the general contractor.

Read the case study

Cumberland Farms

Forty-five sites surveyed, and most told no

Every survey completed inside fourteen days, with a coating recommended only on the most severe canopies. The rest were not sound candidates, and were told so.

Read the case study

Evidence

What a restored store ceiling looks like

Supermarket aisle with a dull, stained acoustical ceiling before coating
BeforeAisle ceiling dulled over years
The same aisle after ProCoustic, ceiling white and even, store open as normal
AfterOpen for business the next morning

Acoustical tile ceiling in a retail interior, dulled and uneven, before the ProCoustic coating
BeforeTile and soffit dulled together
The same retail ceiling after ProCoustic, tile and grid clean and even, fittings back in place
AfterBoth restored in one visit

Neither store lost a day. The work happens after closing and the space opens on its normal schedule.

How did you replace all those ceiling tiles in less than a week?

Store management, Weis MarketsEverett, Pennsylvania. The existing tile was coated in the grid.

Find out what your ceiling needs

We can do a site survey to tell you whether the ProCoat solution is right for you. If replacement is truly the best solution, we will tell you that as well.

Let’s Talk