01Survey
Someone looks at the actual ceiling. The survey establishes the substrate, its condition, whether it has been coated or painted before, and how many tiles need replacing.
02Specification
A written specification naming the products and the preparation for that substrate. If the honest answer is that the ceiling is not a candidate, that is what it says.
03Schedule
Built around the hours the building is available rather than the hours a crew would prefer. Overnight, evenings, weekends or between the last service and the first.
04Protection
Fixtures, stock, equipment and finishes are masked in place. Very little moves, which is where most of the saving against replacement comes from.
05Application
Airless spray, tiles left in the grid, grid and air diffusers coated with the tile so the ceiling has a uniform finish.
06Walkthrough
Handover with the test documentation for your file, the tint record for future touch-up, and the maintenance material for your own team.