Turnkey services

One contract covering the survey, the specification, the crew, the schedule and the sign-off. The client approves a scope and a date.

How a turnkey project runs

Six steps, and only one of them is spraying

01

Survey

Someone looks at the actual ceiling. The survey establishes the substrate, its condition, whether it has been coated or painted before, and how many tiles need replacing.

02

Specification

A written specification naming the products and the preparation for that substrate. If the honest answer is that the ceiling is not a candidate, that is what it says.

03

Schedule

Built around the hours the building is available rather than the hours a crew would prefer. Overnight, evenings, weekends or between the last service and the first.

04

Protection

Fixtures, stock, equipment and finishes are masked in place. Very little moves, which is where most of the saving against replacement comes from.

05

Application

Airless spray, tiles left in the grid, grid and air diffusers coated with the tile so the ceiling has a uniform finish.

06

Walkthrough

Handover with the test documentation for your file, the tint record for future touch-up, and the maintenance material for your own team.

The division of labor

What is included, and what you do

Turnkey means ProCoat carries the project: the survey, the specification, the crew, the schedule, the protection and the handover. It is also the route that carries the manufacturer’s warranty, because the warranty depends on the work being carried out by ProCoat Contract Services at the stated coverage rate over an approved substrate.

What you provide is access, an agreed zoning plan, and somebody who can sign off a zone. Furniture, fixtures and stock generally stay where they are.

We bring

Survey, specification, trained crew, masking and protection, the coating, the schedule, the sign-off and the documentation.

You bring

After-hours access, the ability to turn off the heating, ventilation and air conditioning while spraying, and a name on the handover.

Where it fits

Single buildings and small groups. Programs across many locations run as project management, which adds regional scheduling and reporting on top of the same underlying service.

On site

Applied in place, tiles never leave the grid

Airless spray application of acoustical ceiling coating across tile and suspension grid
Airless spray, in place. Tile, grid and air diffusers are coated in the same pass.

Find out what your ceiling needs

We can do a site survey to tell you whether the ProCoat solution is right for you. If replacement is truly the best solution, we will tell you that as well.