What happened
The problem
A recently remodeled store was inspected shortly before its grand opening. Everything else had been done. The ceiling was filthy, and nobody had addressed it.
That is the common shape of this problem. The ceiling is the last line on the remodel schedule, so it is the first thing to get cut, and it is the one surface a tear-out cannot fix quickly.
The window
Two weeks to deal with forty thousand square feet, in a store that was about to open its doors to the public.
What we did
Restoration of the existing tile, grid and diffusers in place, working around the fixtures and stock that were already set.
The result
Complete before the grand opening, and the date held. When management saw the ceiling they asked how the store had managed to replace all those tiles in less than a week.
The existing tile was coated in place rather than torn out.
How did you replace all those ceiling tiles in less than a week?
When the date cannot move
Grand openings are the most common way a ceiling problem becomes urgent, and the least forgiving. There is no version of this where the date slips quietly.
This is what the answer looks like when the ceiling is found late and the opening is already advertised.